Photo Gallery
See what we're working on!
In the photo gallery, here, you can see the projects that we're currently working on. Also, you can see ideas for your next project, challenges that we have to overcome to get a nice final result, how to do layout for projects from bathroom walls to floors to backsplashes, and what daily life is like for a professional tile setter. If you'd like to see older projects, click here.
If you only want to see finished projects, and aren't so interested in seeing before/after and progress, click the button below that says "Only show me finished projects".
Bookmark this page to follow us and check back often to see how each project turns out!
In this section, you'll see only images of finished projects, for those of you who are looking for project ideas and inspiration (and not so much about the process). Enjoy!
Kitchen backsplash finished
Kitchen backsplash finished
Kitchen backsplash finished
Kitchen backsplash Schluter corner
Basement shower finished
Rendering and final shower
Tub surround fully set
Fireplace surround ledger set
Floor grouted and finished
Primary shower surround finished
Primary shower surround finished
Hall tub surround finished
Primary bath entry
Primary bath floor almost fully installed
Primary bath floor almost fully installed
Primary bath floor closeup
Floor almost complete
Installing the floor
Part of floor installed
Part of floor installed
Kitchen backsplash Schluter corner
Kitchen backsplash finished
Kitchen backsplash finished
Kitchen backsplash finished
Choosing grout color
Inside corner in backsplash
Inside corner in backsplash
Kitchen backsplash set
Last walls of backsplash set
First walls of backsplash set
Fireplace ledger closeup
Fireplace ledger closeup
Fireplace surround ledger set
Kitchen backsplash to be tiled
Always fun running a wet saw in the snow
Kitchen backsplash to be tiled
Current status of primary bath
Shower tile started
Shower floor installed
Floor underlaid
Floor underlaid
Shower pan waterproofed
Finished shower pan and wall underlayment/sealant
Finished shower pan and wall underlayment/sealant
Finished shower pan
Pouring shower pan
Walls reinstalled
Part of walls removed, again, to add insulation behind
Shower pan partly done and walls partly installed
Preslope and liner installed
Prepan installed
Drain installed
Fireplace grouted and finished
Fireplace grouted and finished
Fireplace tile closeup
Fireplace surround set
Fireplace to be tiled
Hood wall tiled
Backsplash hood wall to be tiled
Not enough tile to install 2nd wall
Rendering and final shower
Basement shower finished
Basement shower finished
Shower floor finished
1.5 hours later, glue residue finally removed
Glue residue to remove on every tile
Progress on basement shower
Progress on basement shower
Progress on basement shower
Niche sill installed and tile around
Niche built
Niche to be cut out and installed
Basement shower partly set
Basement shower partly set
Tub surround fully set
Primary bath to be remodeled
Primary bath to be remodeled
Kitchen to be remodeled
Basement shower floor set
Basement shower floor set
Tub surround partly set
Demo pile at the dump
Floor is finally demo'd and cleaned and ready for tile
Floor is finally demo'd and cleaned and ready for tile
Bending over all of the vinyl underlayment screws
Measuring the mold that the mitigation company missed
Measuring the mold that the mitigation company missed
Chipboard underlayment very slow to remove
Slowly removing chipboard underlayment
Throne room cleaned and ready for tile underlayment
Baseboards removed
Toilet removed
More mold found after mold mitigation
Primary shower and bench demo'd
Primary shower and bench demo'd
Demo'ing primary shower
Demo'ing primary shower
Demo'ing primary shower
Starting to do demo