Photo Gallery (12/2024)
See what we've worked on!
In this section, you'll see only images of finished projects, for those of you who are looking for project ideas and inspiration (and not so much about the process). Enjoy!
Tile wrapping corners2
Tile wrapping corners
Finished niche
Backsplash finished
Kitchen backsplash grouted and finished3
Kitchen backsplash grouted and finished2
Kitchen backsplash grouted and finished
Tub surround grouted and finished - grout drying
Master shower fully set2
Master shower fully set
Window tile fully installed
Shaving step finished and installed
Snapped tile epoxy'd
Snapped tile - going to epoxy
Master backsplash installed2
Master backsplash installed
Close to finished with backsplash install
Progress on the backsplash install
Starting on the backsplash install
Master backsplash wall to be tiled
Master shower ceiling set
Master shower walls and ceiling set3
Master shower walls and ceiling set2
Master shower walls and ceiling set
Custom shaving step fabricated2
Custom shaving step fabricated
Master shower walls corner closeup
Master shower walls partially set3
Master shower walls partially set2
Master shower walls partially set
Foam boards wrapped into window
All foam walls installed in shower3
All foam walls installed in shower2
All foam walls installed in shower
Installing the foam boards with sealant ijn and on all seams and screws
Ceiling foam boards installed, with a slope
Closeup of shower floor hexagons
Shower floor completely set2
Shower floor completely set
Starting to tile the shower floor
Tiled the step for the steam machine
More underlayment put onto walls and slope in the ceiling2
More underlayment put onto walls and slope in the ceiling
Finished setting throne room
Master bathroom floor fully set
Finished setting closet
Most of master bath floor set2
Most of master bath floor set
Closet partially set
Shower pan waterproofed2
Shower pan waterproofed
Master backsplash to be tiled
Shower pan installed3
Shower pan installed2
Shower pan installed
Shower pan nearly finished
Walls installed and drain set to height
Liner installed in the large shower pan
Prepan of master shower installed
Prepan packed in master shower pan
Shower pan to be poured/packed
Master bath underlaid
Closet underlaid
Closet to be underlaid
Shower pan to be poured
Master backsplash to be tiled
Master shower to be installed2
Master shower to be installed
Master bath to be tiled2
Master bath to be tiled
Finished backsplash closeup3
Finished backsplash closeup2
Finished backsplash closeup
Backsplash finished3
Backsplash finished2
Backsplash finished
Tile closeup
Corner closeup
Kitchen backsplash set
Kitchen backsplash set2
Kitchen backsplash set3
Tub surround grouted and finished - grout drying
Tub surround grouted and finished
Tile wrapping corners2
Tile wrapping corners
Finished niche
Tub surround fully set
Niche side2
Niche side
Fully tiled niche
Niche installed
Niche box to be installed in wall
Progress for the day
Niche ready to be installed
Studs to be cut in niche area
Laying out the niche
Laying out the walls
Tub surround to be installed
Kitchen backsplash grouted and finished3
Kitchen backsplash grouted and finished
Kitchen backsplash grouted and finished2
