Photo Gallery (07/2025)
See what we've worked on!
In the photo gallery, here, you can see the projects that we worked on during June, 2025. If you'd like to see older projects, click here and for current, ongoing projects, click here.
If you only want to see finished projects, and aren't so interested in seeing before/after and progress, click the button below that says "Only show me finished projects".
Bookmark this page to follow us and check back often to see how each project turns out!
In this section, you'll see only images of finished projects, for those of you who are looking for project ideas and inspiration (and not so much about the process). Enjoy!
Finished stove top accent with pot filler
Finished entry fireplace
Shower fully grouted4
Shower fully grouted
Backsplash grouted and completed
Primary shower fully completed
Secondary bath fully completed
Basement shower grouted and finished
Backsplash grouted and completed
Primary bath fully completed2
Primary shower fully completed
Secondary bath fully completed
Basement floor grouted and finished
Height of new floor matched to old floor
Floor grouted, caulked, and finished
Floor grouted, caulked, and finished2
Part of basement shower tiled3
Part of basement shower tiled2
Part of basement shower tiled
Niche fully installed and sealed
Niche cut out of wall
Laying out niche to be installed
Full basement shower underlayment and sealed2
Full basement shower underlayment and sealed
Underlayment is installed in basement shower
Shower wall to have niche and tile
The plumbing wall needed some adjustment before I got to installing underlayment
Basement shower to be tiled
Backsplash grouted and completed
Primary shower floor fully completed
Primary shower fully completed
Primary bath fully completed2
Primary bath fully completed
Secondary bath fully completed
Major epoxy reaction in my body tonight
Hall shower almost completely grouted
Major problem with epoxy grout slumping in the joints with one mix
Primary shower niches grouted
Primary shower grouted
Primary bath completely grouted
Pottery studio backsplash tiled2
Pottery studio backsplash tiled
Logo accent tile added above sink
Logo engraved in tile
Sketching logo onto tile
Pottery studio backsplash to be tiled
Primary shower fully set2
Primary shower fully set
Primary shower and bath fully set
Tiles set under primary shower curb
Hall bath full set
Hall bath shower niche and pony wall set
Niche fully installed
Laying out hall bath niche
Principal shower ready to be measured for glass
Principal shower niches laid out, cut in, and sealed
Lots of things that need to be removed in these niches
Bench installed and almost complete
Almost complete - just missing solid surface pieces
Niche tile installed
Niche installed and sealed
Niche cut in and supports installed
Niche to be cut in and installed
Primary bath floor closeup
Primary bath and shower floors grouted
Primary bath shower floor grouted
Epoxy grout going into primary shower - in progress
Guest bath floor grouted
Guest shower floor grouted
Current progress on hall bath shower2
Pony wall still needs to be completed
Current progress on hall bath shower
Installed accent band in hall bath shower
Finished installing wainscot in primary bath
All floors are now completely set
Master bath entry threshold installed
Rabbet cut into master bath entryway threshold
Hall bath entry threshold installed
Completed the install of the guest shower floor and curb
Completed the install of the master shower floor
Master shower progress3
Master shower progress2
Master shower progress
Shaving niche installed
Wall with niches coming out
Installing decorative band
Guest shower pebbles closeup
Most of guest shower floor set
Progress on master shower
Progress on master shower and wainscot
Starting to install master shower and wainscot
Waterproofed guest shower pan
Entry fireplace grouted
Screw holes drilled for pot filler
The layout and plan for the guest bath shower
The layout and plan for the master shower
Finished installing the master closet floor
Finished installing the throne room floor
Part of the closet still needs to be set
Part of the throne room still needs to be set
Master bath floor nearly complete2
Master bath floor nearly complete
Some tricky cuts in this floor2
Some tricky cuts in this floor
T-lock closeup in master bath floor
Couple of courses installed into the master bath closet
Master bath floor partially installed
Master bath floor partially installed2
Finished setting guest bath floor
Part of guest bath floor installed
Thinset spread over new warm wire and filling membrane
Sensors installed in warm wire
Warm wire installed in master bath closet
Warm wire installed in master bath throne room
Warm wire installed in master bath floor
Guest bath floor underlaid
Guest bath floor to be underlaid and tiled
Master bath closet underlaid
Master bath throne room underlaid
Master bath floor underlaid
Master bath floor to be underlaid and tiled
More of the walls in the steam shower set4
More of the walls in the steam shower set3
More of the walls in the steam shower set2
More of the walls in the steam shower set
Basement floor grouted and finished
Height of new floor matched to old floor
Very large format tiles installed on walls and ceiling2
Joint from the walls to the ceiling
This material chips and breaks VERY easily
Ceiling tiles are installed
Starting to install ceiling tiles