Photo Gallery (11/2025)
See what we've worked on!
In the photo gallery, here, you can see the projects that we worked on during November, 2025. If you'd like to see older projects, click here and for current, ongoing projects, click here.
If you only want to see finished projects, and aren't so interested in seeing before/after and progress, click the button below that says "Only show me finished projects".
Bookmark this page to follow us and check back often to see how each project turns out!
In this section, you'll see only images of finished projects, for those of you who are looking for project ideas and inspiration (and not so much about the process). Enjoy!
Fireplace finished
Primary shower finished
Primary shower sealed and finished
Primary bath backsplash caulked and completed
Backsplash grouted and finished
Backsplash grouted and finished
Backsplash grouted, caulked, and finished
Backsplash grouted, caulked, and finished
Primary bath backsplash grouted and finished
Fireplace grouted and finished
Primary bath floor grouted and finished
Primary shower grouted and finished
Hall bath floor and shower completely finished
Hall bath shower and floor grouted and finished
Backsplash grouted, caulked, and finished2
Backsplash grouted, caulked, and finished
Fireplace finished
Fireplace finished2
Finished shower
Primary tub surround grouted and finished
Shower fully installed
Shower fully installed
Shower fully installed
Shower fully installed
Shower fully installed
From inside the shower
Corner caddy installed
Bench installed
Installing the floating bench
Bench and corner caddies fabricated
Bench cut out
Granite slab to be fabricated into bench and corner caddies
Progress in the primary shower
From the inside of the shower
Progress in the primary shower
Progress in the primary shower
Ceiling fully set
Wrapping an inside corner
Closeup of accent tile
Corner where floating bench will be installed
Tile wrapped onto the ceiling
Getting a start tiling this primary shower
Getting a start tiling this primary shower
Getting a start tiling this primary shower
Guest bath shower floor pebbles installed
No power, so installing pebbles by flashlight
Primary bath progress
Foam board complete on shower ceiling
From inside the shower
Header on and foam board complete
Primary shower pebbles closeup
Primary shower floor pebbles installed
Installing primary shower floor
Installing primary shower floor
Goboard installed on ceiling and walls that don't touch the header
Ceiling plywood installed, but header still missing
Primary shower sealed and finished
Primary shower finished
Primary bath backsplash caulked and completed
Fireplace finished
Hearth caulked and completed
Niche shelf light rails installed
Backsplash grouted, caulked, and finished
Backsplash grouted, caulked, and finished
Backsplash grouted, caulked, and finished
Backsplash grouted, caulked, and finished
Closeup of grouted tiles
Grouting in progress
Tile on window corner
Backsplash fully set
Progress on final backsplash wall
Progress on final backsplash wall
Backsplash fully set
Tile to be installed on backsplash
Backsplash grouted and finished
Backsplash grouted and finished
Backsplash grouted and finished
Grouting in progress
Grouting in progress
Grouting in progress
Backsplash set
Backsplash set
Backsplash set
Backsplash set
Backsplash in progress
Options for framed accent
Options for framed accent
Options for framed accent
Backsplash to be tiled
Backsplash to be tiled
Primary bath backsplash grouted and finished
Fireplace grouted and finished
Primary shower grouted and finished
Primary closet grouted and finished
Primary bath floor grouted and finished
Primary shower grouted and finished
Primary bath backsplash installed
Primary bath backsplash to be installed
Fireplace surround fully installed
Materials to be installed on kitchen backsplash
Backsplash to get tile
Backsplash to get tile
Part of fireplace installed
Niche fully installed
Primary shower fully set
Primary shower fully set
Working on finishing the primary shower niche
Cutting rabbets into the niches for the lights
Primary shower floor installed
Getting close to finishing primary shower
Leveling primary shower header
Light holes cut out in primary steam shower
Holes need to be cut for lights
Hall bath floor and shower completely finished
More progress on primary shower
More progress on primary shower
More progress on primary shower
Ceiling set
Two tiles broke while up on ceiling - very fragile!
Accent tile in niche installed
Part of primary shower walls installed
Part of primary shower walls installed
Part of primary shower walls installed
Some parts of fireplace will need to be flattened
Fireplace to be remodeled
Niche cut in and finisheing
Niche cut open and we're building it
Niche to be cut out and installed
Ceiling with new slope is sealed and finished
Cutting out ceiling to find out why plumbing is dripping
Installing new slope on primary shower ceiling
Figuring out how to change the primary shower ceiling slope
Primary closet floor fully set
Primary closet floor fully set
Primary bath floor fully set
Register cut out
Register to be cut out
A good portion of the primary bath and closet floor is set3
A good portion of the primary bath and closet floor is set2
A good portion of the primary bath and closet floor is set
Unfortunately, a 3-sided cut has to be snapped to fit
Cut and dry set a good amount of the primary bath and closet floor
Cut and dry set a good amount of the primary bath and closet floor
Cut and dry set a good amount of the primary bath and closet floor
Sealed shower pan membrane down to underlayment
Picked up and delivered all primary bath tile except shower floor
Picked up and delivered all primary bath tile except shower floor
Thinset floated over primary bath warm wire
Thinset floated over closet warm wire
Warm wire cables installed in primary bath2
Warm wire cables installed in primary bath
Warm wire cables installed in primary bath3
Sensor locations in primary bath warm wire
Warm wire underlayment closeup
Warm wire underlayment installed4
Warm wire underlayment installed
Warm wire underlayment cut and dry set
Floor to be underlaid
Shower pan waterproofed
Hall bath shower and floor grouted and finished
Shower drain grate cut and set
Hall bath shower grouted and finished2
Hall bath shower grouted and finished
Fireplace hearth grouted and finished
Hall bath shower completely set2
Hall bath shower completely set
Hearth Schluter and tiles installed4
Hearth Schluter and tiles installed3
Hearth Schluter and tiles installed2
Hearth Schluter and tiles installed
Removing all warm wire from primary bath floor
Warm wire installed in primary bath floor - but too much excess
Sensors installed in primary bath floor
Warm wire installed in primary bath floor
Sensors installed in primary closet
Warm wire installed in primary closet
Foam board walls installed
Foam board walls installed
Demo completed
Demo in process
Demo in process
Beginning to demo backsplash
Ditra Heat thinsetted and fully installed3
Ditra Heat thinsetted and fully installed2
Ditra Heat thinsetted and fully installed
Installing Ditra Heat2
Installing Ditra Heat
Ditra Heat has been cut and installed, but not yet thinsetted down
Floor to get Ditra Heat membrane
Window and other wall set in this bath
Niche installed and sealed
Walls opened up for niche install
Niche to be cut in and installed
Current progress in hall bath
Grouting the floors
Bath floor and shower floor grouted
Closeup of accent tiles2
Closeup of accent tiles
Starting to install the hall shower walls
Hall bath floor and shower floor fully set3
Hall bath floor and shower floor fully set2
Hall bath floor and shower floor fully set
Installing blocking for recessed hearth
Cutting out subfloor to recess tile
Hearth to be recessed into floor
Potential shower to be remodeled
Time for a new wet saw blade
Most of shower floor set and most of bath floor set
Channels set on drain in hall bath
Fireplace cement board installed
Primary shower ready for tile
Hall bath shower pan competely installed
Hall bath shower pan installed
Setting the primary bath shower pan
Cut open walls to install foam pan to the wood
Primary shower walls opened and ready to install foam pan
Shower pan demo'd - ready for foam pan
Demo'ing shower pan
Starting to demo shower pan
Corner joint
Tile closeup
Backsplash grouted, caulked, and finished4
Backsplash grouted, caulked, and finished3
Backsplash grouted, caulked, and finished2
Backsplash grouted, caulked, and finished
Pencil trim with miter
Kichen backsplash fully set2
Kitchen backsplash set
Kitchen backsplash - after
Kitchen backsplash - before
Tile and corner closeup
Primary bath shower grouted and finished3
Primary bath shower grouted and finished2
Primary bath shower grouted and finished
Grouting in progress2
Grouting in progress
Closeup of tile
Closeup of back wall tile
Tile installed
Tub surround completely set
Underlayment installed
Primary bath tub surround to be tiled
Most of underlayment installed on walls in primary shower
Shower pan packed in primary shower
Pan to be packed in primary shower
Drain installed in primary shower
Drain to be installed in primary shower
Guest shower pan waterproofed
Secondary bath shower pan packed
Secondary bath shower pan liner in and walls on
Secondary shower pan prepan packed
Secondary bath shower pan to be packed
Primary bath shower pan to be packed
Finished shower
Bathtub and surround demo'd3
Bathtub and surround demo'd2
Bathtub and surround demo'd
Closeup of fireplace tile
Fireplace finished2
Fireplace finished
