Photo Gallery (12/2025)
See what we've worked on!
In the photo gallery, here, you can see the projects that we worked on during December, 2025. If you'd like to see older projects, click here and for current, ongoing projects, click here.
If you only want to see finished projects, and aren't so interested in seeing before/after and progress, click the button below that says "Only show me finished projects".
Bookmark this page to follow us and check back often to see how each project turns out!
In this section, you'll see only images of finished projects, for those of you who are looking for project ideas and inspiration (and not so much about the process). Enjoy!
Glass strip mosaic tiles installed on part of backsplash
Glass strip mosaic tiles installed on part of backsplash
Part of backsplash grouted
Part of backsplash grouted
Fireplace finished
Finished hearth
Full main area grout recolored
Full main area grout recolored
Front bathroom grout recolored
Applying the Grout Refresh
Recolored grout
Applying the Grout Refresh
Applying Grout Refresh
Applying Grout Refresh
Applying Grout Refresh
Applying Grout Refresh
Applying Grout Refresh
Fireplace finished
Finished hearth
Floor joint caulked
Mitered edge epoxied
Profile cut from wood trim
Profile to be cut off of wood trim
Closeup of travertine ledgers
Closeup of fireplace vent holes
Closeup of hearth miters
Progress on fireplace ledger install
Hearth tiles installed
Cutting and making the miters
Closeup of backsplash tile grouted
Part of backsplash grouted
Grouting in progress
Preparing to grout
Part of backsplash grouted
Preparing to grout
Tub to be remodeled to shower
Tub to be remodeled to shower
Tub to be remodeled to shower
Tub surround to be retiled
Tub surround to be retiled
Tub surround to be retiled
Pantry backsplash fully set
Pantry backsplash fully set
One wall of pantry backsplash set
Getting started on this backsplash
Part of pantry backsplash to be set
Part of pantry backsplash to be set
Closeup of column removed
Closeup of brick corbels removed
Bottom section built out and thinset skim coat
Eco Prim Grip bonding primer applied
Protruding bricks broken and removed
Fireplace to be remodeled
