Main level tub surround grouted
Basement tub surround grouted
Main level bath floor grouted
Basement bath1 floor grouted
Master bathroom floor, tub, and shower finished2
Master bathroom floor, tub, and shower finished
Master shower grouted
Master tub skirt and surround grouted
Basement shower fully set
Basement shower fully set2
Niche view
Curb view
Basement tub surround2 set2
Basement tub surround2 set
Tub is very out of level
Walls replaced
Walls still haven't been replaced - I'll have to do it
Tub surround tile closeup
Main level tub surround grouted
Basement tub surround grouted
Main level bath floor grouted
Basement bath2 floor grouted
Basement bath1 floor grouted
Progress on this hot tub shower2
Progress on this hot tub shower
Niche installed and sill tiled
Niche hole cut out, need to remove stud and add supports
Niche to be installed
Hot tub area walls partially set
I love Italian tiles, but these are terrible2
I love Italian tiles, but these are terrible
Very bad walls, as usual
2nd coat of waterproofing on hot tub area shower pan
Final basement tub is getting replaced due to damage
Big, heavy vanity sitting in the hot tub shower, preventing me from starting to tile there
Some damage in the other tub surround means it needs to be replaced before getting tile
Basement tub surround1 set
Tiles are not consistently sized, so a straight lay is hard to make look good
Tiles replaced and fixed2
Some tiles are poorly aligned (long story) - need to be fixed2
Tiles replaced and fixed
Some tiles are poorly aligned (long story) - need to be fixed
Main level tub surround closeup
Main level tub surround set
Basement bath2 floor fully installed
There are often some tricky measurements and cuts when dealing with hexagon tiles
Basement bath1 floor fully installed
Part of this basement bath floor set
Most of this basement bath floor set
This is a challenge that we always face with Colorado Springs area concrete floors
Waterproofed hot tub shower pan - will do a 2nd coat later
Master shower waterproofed
Waterproofing cracks and expansion joints before tiling this floor
Main level bath floor hexagon tile closeup
Main level bath floor set - 8x8 hexagons
Niche work completed
Niche sill replaced with a solid piece, Schluter recut and installed
Niche sill VERY carefully demo'd and Schluter trim removed
Niche sill has cracked tiles for some unknown reason - need to demo and replace
Shower pan packed/poured closeup
Shower pan packed/poured
Shower pan mostly done
Shower pan liner installed and walls back on
Prepan done
Drain area modified - ready to start the pan
Master bathroom floor, tub, and shower finished2
Master bathroom floor, tub, and shower finished
Master shower grouted
Final piece of Schluter installed on tub
Master tub skirt and surround grouted
Master floor, shower, and tub set
Closeup of glass band
We're short 1 stick of Schluter, so have temporaries now - will install when it comes in
Master tub skirt and surround set
Master tub skirt and surround to be tiled
Backerboard installed on tub skirt - tub and floor are out of level, which will make the install tricky
Closeup of glass band
Master shower set
Finished setting floor and set master shower
Finished setting the floor
Some tricky cuts in this floor2
Some tricky cuts in this floor
Good portion of floor installed
Underlayment installed on floor
Floor to be underlaid and tiled
Need to demo a little more linoleum
Master shower to be tiled
Tub skirt and surround to be tiled
Master shower pan installed
Pre-pan packed, liner installed, and walls are on - ready to install rest of shower pan
No cuts in the pan liner - only folds in the corners
Shower pan liner installed above cement pre-pan
Jack and Jill bath underlaid
Jack and Jill bathroom to be underlaid and tiled
Basement bath2 floor to be tiled
Basement bath1 floor to be tiled
Master shower pan to be poured/packed
Unusual, big shower pan to be poured/packed
Basement shower fully set
Basement shower fully set2
Curb view
Inside curb view
Niche view
Curb at doorway view
Basement bath almost done - just waiting for the granite curb and niche sill to be fabricated in order to finish
Finished installing the niche
Laying out and fabricating the niche
Saw and water are completed frozen, this morning