Photo Gallery (03/2026)
See what we've worked on!
In the photo gallery, here, you can see the projects that we worked on during past months. If you'd like to see older projects, click here and for current, ongoing projects, click here.
If you only want to see finished projects, and aren't so interested in seeing before/after and progress, click the button below that says "Only show me finished projects".
Bookmark this page to follow us and check back often to see how each project turns out!
In this section, you'll see only images of finished projects, for those of you who are looking for project ideas and inspiration (and not so much about the process). Enjoy!
Floor grouted and finished
Primary shower surround finished
Primary shower surround finished
Hall tub surround finished
Hood tile repaired/replaced
Primary bath tile finished
Primary bath tile finished
Floor grouted and finished
Comparing rendering to reality
Shower finished except for floor
Shower finished except for floor
Niche grouted and caulked
Basement shower partly set
Basement shower partly set
Tub surround fully set
Primary bath to be remodeled
Primary bath to be remodeled
Kitchen to be remodeled
Basement shower floor set
Basement shower floor set
Tub surround partly set
Demo pile at the dump
Floor is finally demo'd and cleaned and ready for tile
Floor is finally demo'd and cleaned and ready for tile
Bending over all of the vinyl underlayment screws
Measuring the mold that the mitigation company missed
Measuring the mold that the mitigation company missed
Chipboard underlayment very slow to remove
Slowly removing chipboard underlayment
Throne room cleaned and ready for tile underlayment
Baseboards removed
Toilet removed
More mold found after mold mitigation
Primary shower and bench demo'd
Primary shower and bench demo'd
Demo'ing primary shower
Demo'ing primary shower
Demo'ing primary shower
Starting to do demo
Primary tub surround to be remodeled
Primary shower to be remodeled
Primary floor to be remodeled
Primary shower to be remodeled
Walls installed and sealed on tub surround
Shower pan and walls ready for tile
Shower pan poured
Shower liner installed
Basement shower pan to be poured
Foam board installed on walls
Basement shower to be tiled
Rendering of finished basement shower
Floor grouted and finished
Floor grouted and finished
Floor grouted and finished
Grouting this floor
Grouting this floor
Floor grouted and finished
Dining room floor set
Dining room floor set
Dining room floor set
Dining room floor set
Dining room floor set
Dining room floor set
Checking the distribution and coloring of the tiles
Underlayment installed
Carpet and pad have been demo'd
Floor to be tiled
Underlayment installed
Carpet and pad have been demo'd
Pantry backsplash to be set
Kitchen backsplash to be set
Fireplace to be set
Primary shower surround finished
Primary shower surround finished
Hall tub surround finished
Fully set niche in primary shower
Primary shower surround fully set
Primary shower surround fully set
Primary shower surround fully set
Hall tub surround progress
Hall tub surround progress
Back wall set
Laying out tub surround
Pantry backsplash to be tiled
Kitchen backsplash to be tiled
2 heavy coats of waterproofing with reinforcing fabric
Installing 2nd coat of waterproofing with reinforcing fabric
First coat of waterproofing with reinforcing fabric
Slope fixed on shower floor
Hood tile repaired/replaced
Hood tile to be removed/replaced
Shower floor primed and floated with thinset
Drain way too high with valley in front of it
Primary shower with grout stains and mold
Primary shower with grout stains and mold
Shower recaulked
Shower to be recaulked
Floor grouted and finished
Primary bath tile finished
Primary bath tile finished
Floor grouted and finished
Floor grouted and finished
Floor grouted and finished
Primary shower epoxy grout installed
Primary shower epoxy grout installed
Primary shower epoxy grout installed
Primary shower epoxy grout installed
Primary bath floor fully set
Primary bath floor fully set
Leveler poured on bathroom floor
Priming floor to be leveled
Cleaning floor to be leveled
Floor to be leveled
Floor tile mostly set
Floor tile mostly set
Leveler poured over cables
Leveler poured over cables
Pouring leveler over membrane and cables
Warm wire and sensors installed
Membrane cleaned and ready for warm wire
Membrane to be cleaned and warm wire installed
Comparing rendering to reality
Shower finished except for floor
Niche grouted and caulked
Shower finished except for floor
Shower finished except for floor
Grouting niche
Shower fully set except for missing pebbles
Shower fully set except for missing pebbles
Shower fully set except for missing pebbles
Shower fully set except for missing pebbles
Niche fully set
Progress on setting shower
Progress for the day
Pebbles installed in niche
Installing pebbles in niche
Installing pebbles in niche
Installing pebbles in niche
Shower pan waterproofed
Drain installed to floor pebble height
Shower pan installed
Plumbing hole filled
Shower pan to be packed/poured
Shower started
Basement shower to be underlaid and tiled
Tub surround grouted and finished
Tub surround grouted and finished
Tub surround grouted and finished
Basement shower surround grouted and finished
Basement shower surround grouted and finished
Basement shower surround grouted and finished
Tub surround fully set
Niche fully set
Niche to be centered, cut out, and built
Basement shower fully set
Niche fully set
Niche to be tiled
Progress on the shower surround
Progress on the walls
Starting to install walls
Niche cut in and built
Niche hole cut open
Niche to be cut out and built
Today's progress on the tub surround
Plumbing and window walls set
Window sill set
Tiling the tub surround
Tiling the tub surround
Tub is very warped - have to adjust layout to account
Solid surfaces installed and shower complete
Primary bath shower completed
Primary bath shower completed
Shower surround underlaid
Shower surround to be underlaid and tiled
Tub surround underlaid
Ready for underlayment
Tub surround to be underlaid and tiled
Extra prep done to walls
Tile closeup
Niche grouted
Rendering compared to the fninished shower
Grouted primary shower
Primary shower to be grouted
Grouting shower floor
Niche set - just waiting on solid sill piece
All of bench area set - just waiting on solid bench piece
All tile set - just waiting on solid pieces
All tile set - just waiting on solid pieces
Pony wall built out and leveled/squared
Current progress on primary shower
Current progress on primary shower
Current progress on primary shower
Accent tile installed in back of niche
Niche to be cut out and installed
Window fully set
Part of walls installed
Window sill tile installed
Window about 1/4 in out of level
Floating bench support installed
Pebbles closeup
Pebbles installed on shower floor
Installing the pebbles
Installing the pebbles
Didn't know these were glass pebbles
Cleaned and waterproofed pan
Progress for the day
Primary bath shower to be tiled
Shower pan packed
Liner installed and walls installed
Plumbing hole filled
Shower pan to be packed
Finished grouted floor closeup
Shower grouted and finished
Shower cleaned and ready for grout
Shower grouted and finished
Shower floor grouted
Shower floor ready for grout
Shower fully set
Curb tile installed
Deco band closeup
Installing the band
Installing the band
Building up band with Kerdi membrane
Part of shower walls tiled
Foam board joints and screwed sealed
Basement guest shower to be tiled
Valve parts cut out of foam
Valve needs to be more fully cut out
This board is very proud because of the valve
Living room grout recolored
Living room grout recoloring in process
Living room grout recoloring started
Living room entry recolored
Living room entry before recoloring
Pantry floor recolored