Photo Gallery (08/2024)
See what we've worked on!
In this section, you'll see only images of finished projects, for those of you who are looking for project ideas and inspiration (and not so much about the process). Enjoy!

Master shower grouted and finished

Finished shower surround

Finished shower surround2

Powder room backsplash closeup

Finished upstairs kitchen backsplash2

Basement kitchen backsplash grouted and finished

Basement kitchen backsplash grouted and finished2

Powder room backsplash grouted and finished

Basement tub surround grouted and finished2

Basement tub surround grouted and finished3

Grouted, caulked, and finished niche

Finished upstairs kitchen backsplash

Familiy room grouted and finished

Front entryway grouted and finished

Front entryway grouted and finished2

Basement tub surround grouted and finished

Shower 4 grouted and finished

Shower 7 grouted and finished2

Basement shower 6 grouted and finished

Basement shower 5 grouted and finished

Upstairs tub surround trim

Upstairs tub surround corner

Upstairs tub surround tile closeup

Upstairs tub surround set

Upstairs tub surround to be tiled

Finished master shower

Finished shower surround2

Finished shower surround

Powder room backsplash closeup

Powder room backsplash grouted and finished

Powder room backsplash installed

Powder room backsplash Schluter trim installed

Powder room backsplash to be installed

Master shower grouted and finished

Part of master shower grouted2

Part of master shower grouted

Basement kitchen backsplash grouted and finished2

Basement kitchen backsplash grouted and finished

Master shower fully set

Niche installed, which finished all setting in master shower

Almost finished installing this master shower3

Almost finished installing this master shower2

Almost finished installing this master shower

Finished upstairs kitchen backsplash2

Finished upstairs kitchen backsplash

Basement tub surround grouted and finished3

Basement tub surround grouted and finished2

Basement tub surround grouted and finished

Grouted, caulked, and finished niche

Tub surround fully set

Niche wall set

Niche set

Niche installed

Opening the wall for the niche

Laying out niche

Wavy edge tile is difficult to go smaller grout joints with

Back wall and plumbing wall set2

Back wall and plumbing wall set

Tub surround to be tiled

Problems with screw gun - need a new bit!

Kitchen almost completely ready for underlayment

Laundry room ready for underlayment

All replaced tiles grouted5

All replaced tiles grouted4

All replaced tiles grouted3

All replaced tiles grouted2

All replaced tiles grouted

Demo and replace of 20 tiles on main floor and master bathroom7

Demo and replace of 20 tiles on main floor and master bathroom6

Demo and replace of 20 tiles on main floor and master bathroom5

Demo and replace of 20 tiles on main floor and master bathroom4

Demo and replace of 20 tiles on main floor and master bathroom2

Demo and replace of 20 tiles on main floor and master bathroom

Dining and living rooms dry cut with underlayment

Next section to be underlaid

Familiy room grouted and finished

Front entryway grouted and finished2

Front entryway grouted and finished

Everything set is now grouted2

Everything set is now grouted

Powder room underlaid

Powder room to be underlaid

Coat closet installed

Coat closet to be installed

Finished installing the small closet by the garage

Office and hallway fully set

Door to garage mostly set2

Door to garage mostly set

Office fully set2

Office fully set

Finishing setting the office

Hallway mostly set3

Hallway mostly set2

Hallway mostly set

Family room fully set

Using 2 different leveling systems, for precision and enough strength to pull everything flat

Doorway going into the pantry

Hallway to the garage door

Most of family room area set

The 8 tile options are setup in stacks before starting

Family room partly installed2

Family room partly installed

Front entryway almost completely installed

Starting to install this floor

Thinset troweled over fiberglass tape on seams

Backerboard installed and fiberglass installed on seams4

Backerboard installed and fiberglass installed on seams3

Backerboard installed and fiberglass installed on seams2

Backerboard installed and fiberglass installed on seams

Office underlayment still needs thinset and screws

Family room underlayment still needs thinset and screws

Entryway getting underlaid3

Entryway getting underlaid2

Entryway getting underlaid

Office underlayment still needs thinset and screws

Family room underlayment still needs thinset and screws

Entryway getting underlaid3

Entryway getting underlaid2

Entryway getting underlaid

LOT of tile delivered today - 8000lbs

Main level floor to be underlaid and tiled5

Main level floor to be underlaid and tiled4

Main level floor to be underlaid and tiled3

Main level floor to be underlaid and tiled2

Main level floor to be underlaid and tiled