Photo Gallery (09/2025)
See what we've worked on!
In the photo gallery, here, you can see the projects that we worked on during August, 2025. If you'd like to see older projects, click here and for current, ongoing projects, click here.
If you only want to see finished projects, and aren't so interested in seeing before/after and progress, click the button below that says "Only show me finished projects".
Bookmark this page to follow us and check back often to see how each project turns out!
In this section, you'll see only images of finished projects, for those of you who are looking for project ideas and inspiration (and not so much about the process). Enjoy!
Finished shower
Primary tub surround grouted and finished
Finished primary bathroom2
Backsplash grouted and finished
Finished primary shower niche
Finished primary shower
Stone corner caddies and shaving step
Black textured shower pan and shaving step
Shower grouted and finiished
Shower grouted and finiished3
Most of primary bathroom is grouted and finished
Primary bathroom shower is grouted and finished2
Grouted and finished niches in primary shower
Grouted and finished accent wall in shower
Fireplace surround after
Fireplace surround before
Fireplace completely set
Very slow process with these white marble basketweave pieces
Placing trim border around fire box
Fireplace surround to be tiled
Primary shower we may be installing
Primary tub surround grouted and finished4
Primary tub surround grouted and finished3
Primary tub surround grouted and finished2
Primary tub surround grouted and finished
Niche closeup
Primary bath tub surround fully set2
Primary bath tub surround fully set
Kitchen backsplash to be set2
Kitchen backsplash to be set
Hall bath shower underlaid
Primary shower underlaid3
Primary shower underlaid
Ceiling underlaid and sealed
Light cables cut and fished through stud
Need to measure, cut, and pull lines for lights through the stud
Hall bath shower partly underlaid
Hall bath shower to be tiled
Primary shower partly underlaid
Primary bath shower to be underlaid and set
Hall bath floor to be underlaid and tiled
Hall bath shower pan to be packed
Finished primary bathroom2
Finished primary bathroom
Backsplash grouted and finished
Finished primary shower2
Finished primary shower niche
Finished primary shower
Primary bath backsplash installed
Primary bath backsplash underlayment installed
Primary bath backsplash to be installed
Primary shower fully installed
Primary shower niche completely installed2
Primary shower niche completely installed
Hexagon band installed and almost all tile set
Hexagon band in progress4
Hexagon band in progress3
Hexagon band in progress2
Hexagon band in progress
Going to start tiling the hexagon band
Shower floor tile closeup
Shower floor installed
Niche built/installed
Niche cut out
Niche to be built/installed
Steam shower control now fits flush3
Steam shower control now fits flush2
Steam shower control now fits flush
Hole cut for steam shower control
Cutting hole for steam shower control
Need to cut hole for steam shower control
Just missing window and niche sills
Tub surround almost completely set
Primary bath floor closeup2
Primary bath floor closeup
Primary bath floor grouted
Shower pan waterproofed
Niche built and installed
Removing studs to install niche
Cutting open the wall for the niche
Niche to be installed
Electricty has been moved from niche area
Tub surround fully underlaid
Upstairs bath floor closeup2
Upstairs bath floor closeup
Upstairs bath floor set2
Upstairs bath floor set
Upstairs bath underlayment installed and sealed
Floor underlayment installed
Current progress
Drain in and extensions cut and installed
Had to cut parts of jj
Electrical line will need to be moved from the niche area
Underlayment mostly installed
Underlayment installed except for one wall
Using foam shims to furr the wall flat
Tub surround to be underlaid and tiled
Stone corner caddies and shaving step
Black textured shower pan and shaving step
Shower grouted and finiished3
Shower grouted and finiished2
Shower grouted and finiished
Shower surround fully set2
Shower surround fully set
VERY time-consuming and tricky octagonal window2
VERY time-consuming and tricky octagonal window
VERY tricky Schluter cuts around this octagonal window
Some of the different lengths to the octagonal window sides
Grouted and finished accent wall in shower
Grouted and finished niches in primary shower
Primary bathroom shower is grouted and finished2
Primary bathroom shower is grouted and finished
Most of primary bathroom is grouted and finished
Secondary bath floor is grouted and finished
Secondary bath floor set
Secondary bath floor almost full set
Secondary bath floor underlaid
Most of primary bath set
Tub accent wall set
Guest bath floor demo'd and ready to underlay
Primary shower fully set
Tile installed into niches2
Tile installed into niches
Pony wall and niche area
Progress on primary shower
Laying out and cutting the niches3
Laying out and cutting the niches2
Laying out and cutting the niches
Pony wall and niche area
Progress on primary shower
Laying out and cutting the niches3
Laying out and cutting the niches2
Laying out and cutting the niches